Posts

Showing posts with the label BIM approach

Traditional Approach vs BIM Approach

Image
  Timely Incomplete Design Information Sharing and Communication : In traditional 2D CAD design, the different participants have to wait for each other’s design completion; the data deliverable are piled in silos before they can be exchanged between the design teams. In such a case, data can become obsolete, in other words, the data goes to waste. In contrast, In  BIM -based design, early and timely exchange of incomplete  information  between participants is enabled by sharing and integrating the  building information models  of the teams at any point in time. This allows real-time design adjustments and development. The information is then always up-to-date, and the clear design intent visualization facilitates communication between players and allows for  continuous information flow  instead of interrupting the batch flow. Idle Time The BIM-based design phases clearly show the reduction in delays as opposed to the  traditional  design...